  Code List 4017
 
 
* 4017
Delivery plan commitment level code
Code specifying the level of commitment to a delivery plan.
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
 
  1
Firm
  Indicates that the scheduling information is a firm commitment.
  2
Commitment for manufacturing and material
  Authorizes the supplier to start the manufacturing of goods.
  3
Commitment for material
  Authorizes the manufacturer to order material required for manufacturing specified goods.
| 4
Planning/forecast
  An estimate of future requirements based on trends and actual information.
  5
Short delivered on previous delivery
  Part of a consignment which was not delivered when the original delivery was made.
  6
Capacity available
  Capacity is available to meet the requested scheduling demands.
| 9
User defined
  The user can interpret the meaning of the values from information exchanged previously.
  10
Immediate
  Indicates that the scheduling information is for immediate execution.
| 11
Pilot/Pre-volume
  Initial products required in advance of the normal production process.
| 12
Planning
  An estimate of future requirements.
| 13
Potential order increase
  The possibility and magnitude of a schedule fluctuation.
| 14
Average plant usage
  The usual amount that a manufacturing facility will use over a specified duration.
| 15
First time reported firm
  Initial confirmation of a material requirement.
| 16
Maximum
  The highest attainable amount.
| 17
Tooling capacity
  The maximum amount that the process was designed to accommodate.
| 18
Normal tooling capacity
  The anticipated amount that the process was designed to accommodate over a specific period of time.
| 19
Prototype
  The preliminary version of a product or service.
| 20
Strike protection
  Product level that is set aside as protection in the event of a work stoppage.
| 21
Required tooling capacity
  The contracted amount that the process was designed to accommodate over a specific period of time.
  22
Deliver to schedule
  Deliver to schedule separately supplied.
  23
Await manual pull
  Await non-EDI instruction before shipping.
  24
Reference to commercial agreement between partners
  The buyer's commitment is the one defined in the commercial agreement.
  26
Proposed
  Indicates that the scheduling information is a proposal.
 