1 |
| Firm |
|
Indicates that the scheduling information is a firm commitment. |
|
| |
2 |
| Commitment for manufacturing and material |
|
Authorizes the supplier to start the manufacturing of goods. |
|
| |
3 |
| Commitment for material |
|
Authorizes the manufacturer to order material required for manufacturing specified goods. |
|
| |
4 |
| Planning/forecast |
|
An estimate of future requirements based on trends and actual information. |
|
| |
5 |
| Short delivered on previous delivery |
|
Part of a consignment which was not delivered when the original delivery was made. |
|
| |
6 |
| Capacity available |
|
Capacity is available to meet the requested scheduling demands. |
|
| |
7 |
| Promotion |
|
All related schedule information refer to a promotion. |
|
| |
8 |
| Special demand |
|
All related schedule information refers to a special demand. |
|
| |
9 |
| User defined |
|
The user can interpret the meaning of the values from information exchanged previously. |
|
| |
10 |
| Immediate |
|
Indicates that the scheduling information is for immediate execution. |
|
| |
11 |
| Pilot/Pre-volume |
|
Initial products required in advance of the normal production process. |
|
| |
12 |
| Planning |
|
An estimate of future requirements. |
|
| |
13 |
| Potential order increase |
|
The possibility and magnitude of a schedule fluctuation. |
|
| |
14 |
| Average plant usage |
|
The usual amount that a manufacturing facility will use over a specified duration. |
|
| |
15 |
| First time reported firm |
|
Initial confirmation of a material requirement. |
|
| |
16 |
| Maximum |
|
The highest attainable amount. |
|
| |
17 |
| Tooling capacity |
|
The maximum amount that the process was designed to accommodate. |
|
| |
18 |
| Normal tooling capacity |
|
The anticipated amount that the process was designed to accommodate over a specific period of time. |
|
| |
19 |
| Prototype |
|
The preliminary version of a product or service. |
|
| |
20 |
| Strike protection |
|
Product level that is set aside as protection in the event of a work stoppage. |
|
| |
21 |
| Required tooling capacity |
|
The contracted amount that the process was designed to accommodate over a specific period of time. |
|
| |
22 |
| Deliver to schedule |
|
Deliver to schedule separately supplied. |
|
| |
23 |
| Await manual pull |
|
Await non-EDI instruction before shipping. |
|
| |
24 |
| Reference to commercial agreement between partners |
|
The buyer's commitment is the one defined in the commercial agreement. |
|
| |
26 |
| Proposed |
|
Indicates that the scheduling information is a proposal. |
|